Mumbai Wiki
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
[[File:Images_(88).jpg|thumb|259px]]
 
[[File:Images_(88).jpg|thumb|259px]]
   
<p style="line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;">'''The Sion Panvel Expressway is a 25km highway in connecting the city of [http://en.wikipedia.org/wiki/Mumbai Mumbai] to [http://en.wikipedia.org/wiki/Panvel Panvel] via [http://en.wikipedia.org/wiki/Navi_Mumbai Navi Mumbai].<sup class="reference" id="cite_ref-1" style="line-height:1em;">[http://en.wikipedia.org/wiki/Sion_Panvel_Expressway#cite_note-1 [1]]</sup> It is one of the busiest and most important roads in the [http://en.wikipedia.org/wiki/Mumbai_Metropolitan_Area Mumbai Metropolitan Area] and connects the city with [http://en.wikipedia.org/wiki/National_Highway_4_(India) National Highway 4]. It is generally 12 lanes wide (6 lanes in each direction)<sup class="reference" id="cite_ref-2" style="line-height:1em;">[http://en.wikipedia.org/wiki/Sion_Panvel_Expressway#cite_note-2 [2]]</sup>. The highway begins at BARC Junction [http://en.wikipedia.org/wiki/Sion,_Mumbai Sion] and stretches up to Kalamboli Junction [http://en.wikipedia.org/wiki/Panvel Panvel]<sup class="reference" id="cite_ref-3" style="line-height:1em;">[http://en.wikipedia.org/wiki/Sion_Panvel_Expressway#cite_note-3 [3]]</sup>.'''</p>
+
<p style="line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;"><span style="line-height:19.200000762939453px;">The '''Sion Panvel Expressway''' is a 25km</span>''' '''<span style="line-height:19.200000762939453px;">highway , connecting the city of </span>[[Mumbai]]<span style="line-height:19.200000762939453px;"> to </span>[[Panvel]]<span style="line-height:19.200000762939453px;"> via </span>[[Navi Mumbai]]<span style="line-height:19.200000762939453px;">.</span><span style="line-height:19.200000762939453px;"> It is one of the busiest and most important roads in the </span>[[Mumbai Metropolitan Region|Mumbai Metropolitan Area]]<span style="line-height:19.200000762939453px;"> and connects the city with </span>[http://en.wikipedia.org/wiki/National_Highway_4_(India) National Highway 4]<span style="line-height:19.200000762939453px;">. It is generally 12 lanes wide (6 lanes in each direction)</span><span style="line-height:19.200000762939453px;">. The highway begins at BARC Junction </span>[[Sion]]<span style="line-height:19.200000762939453px;"> and stretches up to [[Kalamboli]] </span>''' '''<span style="line-height:19.200000762939453px;">Junction </span>[[Panvel]]<span style="font-size:11px;line-height:11px;"><u> </u></span>'''.'''</p>
   
<p style="margin-top:0.4em;margin-bottom:0.5em;line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;">'''Maharashtra State Road Development Corporation Ltd. as directed by Government of Maharashtra proposes to undertake the work of Widening and Improvement of Sion-Panvel Highway including construction of flyovers on BOT basis.<sup class="reference" id="cite_ref-4" style="line-height:1em;">[http://en.wikipedia.org/wiki/Sion_Panvel_Expressway#cite_note-4 [4]]</sup>'''</p>
+
<p style="margin-top:0.4em;margin-bottom:0.5em;line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;">Maharashtra State Road Development Corporation Ltd. as directed by Government of Maharashtra proposes to undertake the work of Widening and Improvement of Sion-Panvel Highway including construction of flyovers on BOT basis.</p>
  +
==Salient Features==
=='''<span class="editsection" style="-webkit-user-select:none;float:right;margin-left:5px;">[[http://en.wikipedia.org/w/index.php?title=Sion_Panvel_Highway&action=edit&section=1 edit]]</span>Salient Features'''==
 
*'''The stretch of road from BARC Junction to Kalamboli Junction is about 25 kilometres in length.'''
+
*The stretch of road from '''BARC Junction''' to '''Kalamboli Junction''' is about 25 kilometres in length.
*'''Total Project cost Rs. 825 Crore (Based on DSR of 2006-2007).'''
+
*Total Project cost Rs. 825 Crore (approx.).
*'''Base Construction cost Rs. 675 Crores'''
+
*Base Construction cost Rs. 675 Crores
<p style="line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;">'''The project consists of <sup class="reference" id="cite_ref-5" style="line-height:1em;">[http://en.wikipedia.org/wiki/Sion_Panvel_Expressway#cite_note-5 [5]]</sup>'''</p>
+
<p style="line-height:19.200000762939453px;color:rgb(0,0,0);font-family:sans-serif;">'''The project consists of :'''</p>
   
  +
#'''Widening of the existing bituminous road to 5+5 lanes with concrete pavements.'''
+
#Widening of the existing bituminous road to 5+5 lanes with concrete pavements.
#'''Central 3+3 lanes to be access controlled.'''
+
#Central 3+3 lanes to be access controlled.
#'''The Service roads to be provided whenever required for about 6.29 kilometres.'''
+
#The Service roads to be provided whenever required for about 6.29 kilometres.
#'''Provision of signal free passage for through traffic'''
+
#Provision of signal free passage for through traffic
#'''3 new Flyovers at Uran Junction, Sanpada Junction & Kamothe Junction.'''
+
#3 new Flyovers at Uran Junction, Sanpada Junction & Kamothe Junction.
#'''Duplication of flyovers at Taloja and Chembur Mankhurd Link Road junctions.'''
+
#Duplication of flyovers at Taloja and Chembur Mankhurd Link Road junctions.
#'''Pedestrian crossing Underpasses at 10 locations.'''
 
#'''Foot over Bridges at 3 locations.'''
+
#Pedestrian crossing Underpasses at 10 locations.
  +
#Foot over Bridges at 3 locations.
#'''Geometric Junction improvements as per standards.'''
+
#Geometric Junction improvements as per standards.
#'''Toll plaza at Vashi to be upgraded to 8+8 lanes, Toll fee at prescribed rates (current rate)and Toll period to be quoted by BOT Contractor.'''
+
#Toll plaza at Vashi to be upgraded to 8+8 lanes, Toll fee at prescribed rates (current rate)and Toll period to be quoted by BOT Contractor.
#'''Landscaping / Beautification of entire project corridor including Median plantation, Road side plantation, Landscaping and Beautification below flyovers.'''
+
#Landscaping / Beautification of entire project corridor including Median plantation, Road side plantation, Landscaping and Beautification below flyovers.
#'''Renovation / upgradation of existing flyovers, structures.'''
+
#Renovation / upgradation of existing flyovers, structures.
#'''Electrification of entire project corridor.'''
+
#Electrification of entire project corridor.
#'''Operation and Maintenance of Project Facilities up to the end of tol'''l''' period quoted by BOT '''Contractor.
+
#Operation and Maintenance of Project Facilities up to the end of toll period quoted by BOT Contractor.
[[Category:SIon]]
 
[[Category:Mumbai]]
+
[[Category:Very Important Roads]]
[[Category:National Highway]]
+
[[Category:Roads]]

Latest revision as of 05:55, 26 May 2014

Images (88)

The Sion Panvel Expressway is a 25km highway , connecting the city of Mumbai to Panvel via Navi Mumbai. It is one of the busiest and most important roads in the Mumbai Metropolitan Area and connects the city with National Highway 4. It is generally 12 lanes wide (6 lanes in each direction). The highway begins at BARC Junction Sion and stretches up to Kalamboli Junction Panvel .

Maharashtra State Road Development Corporation Ltd. as directed by Government of Maharashtra proposes to undertake the work of Widening and Improvement of Sion-Panvel Highway including construction of flyovers on BOT basis.

Salient Features[]

  • The stretch of road from BARC Junction to Kalamboli Junction is about 25 kilometres in length.
  • Total Project cost Rs. 825 Crore (approx.).
  • Base Construction cost Rs. 675 Crores

The project consists of :


  1. Widening of the existing bituminous road to 5+5 lanes with concrete pavements.
  2. Central 3+3 lanes to be access controlled.
  3. The Service roads to be provided whenever required for about 6.29 kilometres.
  4. Provision of signal free passage for through traffic
  5. 3 new Flyovers at Uran Junction, Sanpada Junction & Kamothe Junction.
  6. Duplication of flyovers at Taloja and Chembur Mankhurd Link Road junctions.
  7. Pedestrian crossing Underpasses at 10 locations.
  8. Foot over Bridges at 3 locations.
  9. Geometric Junction improvements as per standards.
  10. Toll plaza at Vashi to be upgraded to 8+8 lanes, Toll fee at prescribed rates (current rate)and Toll period to be quoted by BOT Contractor.
  11. Landscaping / Beautification of entire project corridor including Median plantation, Road side plantation, Landscaping and Beautification below flyovers.
  12. Renovation / upgradation of existing flyovers, structures.
  13. Electrification of entire project corridor.
  14. Operation and Maintenance of Project Facilities up to the end of toll period quoted by BOT Contractor.